最新加勒比一本道综合

  1. Home
  2. Investors
  3. Upstream major projects
  4. 2017 Upstream major projects
  5. Khazzan Phase 1, Oman

Khazzan Phase 1, Oman

Completed: 22 September 2017

115 mboed peak annual average production, net to BP
“The start of production from Khazzan, BP’s sixth and largest major project start-up so far this year, is an important milestone in our strategic partnership with Oman. With further development already planned, this giant field has the potential to produce gas for Oman for decades to come.”
?

Bob Dudley, BP group chief executive

最新加勒比一本道综合Extracting gas tightly held in the old, hard rocks of Khazzan is challenging. BP brings global experience in advanced seismic, hydraulic fracturing and well design expertise, which has been vital in the work to date. The world’s largest onshore seismic survey and precise 3D modelling of the subsurface was conducted to understand where the gas is and how it is distributed. Highly accurate horizontal drilling is now being undertaken and fluids are being injected at pressure to coax the gas out. The expertise gained by Omani engineers will enhance the capability of Oman’s oil & gas sector.

?

Over the life of the project around 300 wells will be drilled and a third train added to the CPF.

?

Location Oman
Operator BP
Partners BP (60%), Oman Oil (40%) 
Project type Tight gas
Peak annual average production
~ 200 mboed (gross)
~ 115 mboed ( (net)

Gallery

Khazzan Phase 1, Oman
Khazzan Phase 1, Oman
Khazzan Phase 1, Oman
Khazzan Phase 1, Oman
Khazzan Phase 1, Oman
Khazzan Phase 1, Oman
最新加勒比一本道综合第一页_最新加勒比一本道综合第一页4V视频 大大香蕉最新加勒比一本道综合国产_大香蕉久久最新加勒比一本道综合国产视频 俺去也,最新加勒比一本道综合,妹妹情色,咪咪五月天,做爱五月天,妹妹社区,插妹妹影院 好屌色-haodiaose-色哥哥-好屌色-haodiaose-色哥哥-这里有你想看的极品AV视频 天天啪_天天啪久久99re热在线播放_天天啪在线影院_免费天天啪,天天干av最新加勒比一本道综合 最新加勒比一本道综合,最新加勒比一本道综合,最新加勒比一本道综合,最新加勒比一本道综合,最新加勒比一本道综合 日本最新加勒比一本道综合毛片在线看_岛国爱情动作片_岛国片在线播放97 最新加勒比一本道综合_免费一级特黄大片_日本一级特黄大片