最新加勒比一本道综合

  1. Home
  2. Investors
  3. Upstream major projects
  4. 2018 Upstream major projects
  5. Atoll Phase 1, Egypt

Atoll Phase 1, Egypt

Completed: 2 December 2017

~45 mboed peak annual average production, net to BP
Atoll Phase 1, Egypt
“BP is focused on delivering growth with discipline, carefully choosing and efficiently executing high-quality projects. The longstanding partnerships we have in Egypt allowed us to fast-track Atoll’s development and deliver first gas only 33 months after discovery. This is a further demonstration of our commitment to help realise Egypt’s oil and gas potential and meet the increasing demand from its growing population.”
?

Bob Dudley, BP group chief executive

BP announced the Atoll discovery in March 2015. The main reservoir in the field contains an estimated 1.5 trillion cubic feet of gas and 31 million barrels of condensates, and further segments are under evaluation.

The Atoll Phase 1 project is an early production scheme involving the recompletion of an existing exploration well as a producing well, the drilling of two additional wells, the installation of the necessary subsea infrastructure, and upgrading of existing onshore facilities required to produce from the field.

The Atoll project was delivered 33 months after discovery, with test production starting on 2 December 2017, seven months ahead of the original plan. The project will produce up to 350 million standard cubic feet a day (mmscfd) gas and 10,000 barrels per day (bpd) condensate, which will be processed at the West Harbour facilities and fed into Egypt's national grid.

Location  Egypt
Operator Pharaonic Petroleum Company (PhPC)
Partners BP (100%)
Project type Conventional gas
Peak annual average production
~65 mboed(gross)
~45 mboed (net)
Atoll Phase 1, Egypt

Atoll’s exploration well reached 6400 metres in depth in 2015. That’s drilling further than the height of Mount Kilimanjaro (5,895 metres).

Atoll Phase 1, Egypt

Atoll’s wells on the seabed connect to new and existing production facilities. That subsea tieback is BP’s longest on record at 110 kilometres, almost as far as the distance between the Egyptian cities of Cairo and Suez.

Atoll Phase 1, Egypt

最新加勒比一本道综合The Atoll project was delivered 33 months from discovery and seven months ahead of original plan.

Gallery

Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
最新加勒比一本道综合第一页_最新加勒比一本道综合第一页4V视频 大大香蕉最新加勒比一本道综合国产_大香蕉久久最新加勒比一本道综合国产视频 俺去也,最新加勒比一本道综合,妹妹情色,咪咪五月天,做爱五月天,妹妹社区,插妹妹影院 好屌色-haodiaose-色哥哥-好屌色-haodiaose-色哥哥-这里有你想看的极品AV视频 天天啪_天天啪久久99re热在线播放_天天啪在线影院_免费天天啪,天天干av最新加勒比一本道综合 最新加勒比一本道综合,最新加勒比一本道综合,最新加勒比一本道综合,最新加勒比一本道综合,最新加勒比一本道综合 日本最新加勒比一本道综合毛片在线看_岛国爱情动作片_岛国片在线播放97 最新加勒比一本道综合_免费一级特黄大片_日本一级特黄大片