最新加勒比一本道综合

  1. Home
  2. Investors
  3. Upstream major projects
  4. 2018 Upstream major projects
  5. Shah Deniz Stage 2, Azerbaijan

Shah Deniz Stage 2, Azerbaijan

Completed: 30 June 2018

110 mboed peak annual average production, net to BP
"Shah Deniz 2 is one of the biggest and most complex new energy projects anywhere in the world, comprising major offshore, onshore and pipeline developments. BP and our partners have safely and successfully delivered this multi-dimensional project as designed, on time and on budget."?
?

Bob Dudley, BP group chief executive

?

?

BP and its partners announced the start-up of Shah Deniz 2 on 30th June 2018, including its first commercial gas delivery to Turkey.

The BP-operated $28 billion project is the first subsea development in the Caspian Sea. At plateau, Shah Deniz 2 is expected to produce 16 billion cubic metres of gas per year (bcma) incrementally to current Shah Deniz production.

Offshore, the project includes 26 subsea wells, a subsea production system, two bridge-linked offshore platforms and 500 km of subsea flowlines. The gas is transported to the onshore Sangachal terminal near Baku, which had new processing and compression facilities installed as part of the project. The project also includes expansion of the South Caucasus Pipeline in Azerbaijan and Georgia, and two new compressor stations and a metering station in Georgia.

最新加勒比一本道综合 Shah Deniz 2 is the starting point for the Southern Gas Corridor series of pipelines that will deliver natural gas from the Caspian Sea direct to European markets for the first time from 2020.

Location Azerbaijan
Operator BP
Partners BP (28.8%), SOCAR (16.7%), PETRONAS (15.5%), Lukoil (10%), NICO (10%), TPAO (19%)
Project type Conventional gas
Peak annual average production
~310 mboed (gross)
~110 mboed (net)

In numbers: three countries, one gas project

In full: check out the engineering facts and figures of Shah Deniz 2

Azerbaijan

Two new bridge-linked platforms constructed by 5,000+ workers and installed offshore in the Caspian Sea?

Georgia

Two new compressor stations constructed, each one approximately the size of 20 football pitches

Turkey

This is the highest point of the new 1,850km-long TANAP pipeline, located in the east of Turkey

Gallery

?

Building a gas project across three countries

Tens of thousands of people have played their part in delivering a new source of gas from the Caspian Sea to Turkey. BP Magazine meets a handful of those involved

最新加勒比一本道综合第一页_最新加勒比一本道综合第一页4V视频 大大香蕉最新加勒比一本道综合国产_大香蕉久久最新加勒比一本道综合国产视频 俺去也,最新加勒比一本道综合,妹妹情色,咪咪五月天,做爱五月天,妹妹社区,插妹妹影院 好屌色-haodiaose-色哥哥-好屌色-haodiaose-色哥哥-这里有你想看的极品AV视频 天天啪_天天啪久久99re热在线播放_天天啪在线影院_免费天天啪,天天干av最新加勒比一本道综合 最新加勒比一本道综合,最新加勒比一本道综合,最新加勒比一本道综合,最新加勒比一本道综合,最新加勒比一本道综合 日本最新加勒比一本道综合毛片在线看_岛国爱情动作片_岛国片在线播放97 最新加勒比一本道综合_免费一级特黄大片_日本一级特黄大片